The project
Cracking and a local drop of 4–5 mm had appeared in the fifth-floor ceilings of a flat beneath a recently refurbished penthouse. With both flats occupied, the freeholder’s board needed an independent view of what was happening, whether it was safe, and what it would take to fix.
Diagnosis
The floor is a period filler-joist construction: clinker concrete spanning between steel beams built into the masonry. Cracking of this kind would ordinarily be monitored. What changed the assessment was water.
- Cracks ran along the lines of the embedded beams, not randomly across the soffit.
- At the main crack the clinker had debonded from the underside of the steel — the cause of the local displacement.
- Trapped moisture was accelerating corrosion; expanding rust was breaking the surrounding clinker.
Interim safety and repair
We set out proportionate interim measures — exposed ceilings, load restrictions above, tell-tale monitoring and a clear trigger for precautionary propping — and developed two repair routes to the same standard so the board can compare contractor prices: strengthening from below within the lower flat, or opening up from above to expose and treat the original beams. Alongside this, we are assessing the penthouse floor build-up against the original construction to establish objectively whether the refurbishment increased the load.